Skip to content

Instantly share code, notes, and snippets.

@doevelopper
Created April 20, 2025 15:58
Show Gist options
  • Save doevelopper/ce386fa300ce85fae69cd730239e9b6d to your computer and use it in GitHub Desktop.
Save doevelopper/ce386fa300ce85fae69cd730239e9b6d to your computer and use it in GitHub Desktop.
# Engineering Project Workflow: Procurement to Delivery

Engineering Project Workflow: Procurement to Delivery

Phase 1: Project Initiation and Procurement

Procurement Document Received

  • System logs receipt of procurement document
  • Notification sent to Program Director and Project Management Office
  • Automated document classification and preliminary analysis

Project Authorization

  • Program Director routes to appropriate Program Manager
  • Program Manager creates project workspace in system
  • System generates project ID and basic documentation structure

Initial Project Assessment

  • Program Manager conducts preliminary analysis
  • Notification to Engineering Architects (Software, Electronic, Mechanical)
  • System schedules project kickoff meeting with critical stakeholders

Phase 2: Project Planning and Architecture

Requirements Analysis

  • Software, Electronic, and Mechanical Architects review procurement documents
  • System captures technical requirements in structured format
  • Requirements linked to applicable norms and standards

Architecture Design

  • Architects collaborate on system architecture
  • n8n workflow automates architecture document assembly
  • Cross-discipline review triggered for interface alignment

Resource Allocation

  • System identifies required specialists based on architecture requirements
  • Program Manager approves resource allocation
  • Notification to assigned team members with relevant documentation access

Phase 3: Detailed Design

Technical Planning

  • Team leads establish discipline-specific design tasks
  • n8n integrates with planning tools for task tracking
  • System schedules design review milestones

Design Development

  • Engineers work in respective tools (CAD, EDA, IDEs)
  • Version control integration captures design artifacts
  • Automated nightly checks for cross-discipline compatibility

Design Validation

  • System triggers BDD/TDD framework setup
  • Verification against requirements automatically checked
  • Design review workflow activates when milestones reached

Phase 4: Implementation

Development Execution

  • Engineers implement designs in respective technologies (C++, C, Python)
  • CI/CD pipelines automate build and testing processes
  • n8n coordinates cross-team dependencies

Quality Assurance

  • Automated testing through integrated BDD/TDD frameworks
  • System logs compliance with engineering norms
  • Quality metrics dashboard updates for project stakeholders

Integration Management

  • System coordinates integration points between disciplines
  • Integration testing workflow triggers at predefined points
  • Notification of integration issues to relevant team members

Phase 5: Verification and Validation

System Testing

  • Automated test execution across all subsystems
  • Results documented against requirements
  • Issues routed to appropriate engineering teams

Compliance Verification

  • System checks against applicable norms and standards
  • Documentation completeness verification
  • Regulatory compliance workflow triggered if applicable

Acceptance Testing

  • Client acceptance test procedures automated where possible
  • Results captured and linked to requirements
  • Approval workflow for stakeholder sign-off

Phase 6: Deployment and Delivery

Production Preparation

  • DevOps workflows prepare deployment environments
  • Release documentation automatically assembled
  • Final quality gates checked before release

Delivery Execution

  • System generates delivery package
  • Client handover workflow initiated
  • Deployment support team notification

Project Closure

  • Lessons learned session scheduled
  • Project metrics compiled
  • Knowledge base updated with project artifacts

Workflow Optimizations

  1. Cross-Discipline Coordination

    • Automated detection of design conflicts between disciplines
    • Joint review sessions scheduled when critical interfaces change
  2. Scalability Provisions

    • Resource utilization monitoring for team expansion needs
    • Automated onboarding workflows for new team members
  3. SAFe Agile Integration

    • Program increment planning automation
    • Value stream mapping visualization
    • Sprint management integrated with engineering workflows
  4. Engineering Standards Enforcement

    • Code quality checks for software components
    • Design rule verification for electronic components
    • Tolerance analysis for mechanical components
  5. Knowledge Management

    • Automated documentation from code and design files
    • Centralized technical decision records
    • Searchable knowledge base across projects
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment