# Summary: | |
# The several cost tables and matrices depend on a series of road properties. | |
# The breakdown below represents the Mozambique data model and will have to be | |
# adapted for the Haiti case. Some properties are likely to be replaced and | |
# others removed | |
# | |
# Needed values: | |
# targetSurfType - Matrix for the resulting surface type after a given improvement is applied. | |
# | |
# targetSurfaceCategory - Matrix for the resulting surface status after a given improvement is applied. | |
# | |
# defaultAADT - Sensible defaults for road segments with AADT of 0. | |
# | |
# bridgeConditionRates - Condition rate of the bridge or culvert. | |
# | |
# roadUserCost - Road User Cost (RUC) in dollar/km per type of road. | |
# | |
# interventionCost - Cost of each one of the interventions. | |
# | |
# maintenanceCost - Maintenance values for the road agency. | |
# | |
# repairCostRoad - Repair cost of a road per kilometer after a flood. | |
# | |
# floodRepairTime - Flood repair time in hours / km. | |
# | |
# designStandard - For which return period were the bridges and culverts designed for. | |
###################################### | |
# Breakdown of all current values | |
# Matrix for the resulting surface type after a given improvement is applied. | |
targetSurfType: | |
upgrade-gravel: gravel | |
upgrade-asphalt: asphalt | |
rehab-earth: earth | |
rehab-gravel: gravel | |
rehab-asphalt: asphalt | |
# Matrix for the resulting surface status after a given improvement is applied. | |
targetSurfaceCategory: | |
upgrade-gravel: unpaved | |
upgrade-asphalt: paved | |
rehab-earth: unpaved | |
rehab-gravel: unpaved | |
rehab-asphalt: paved | |
# Sensible defaults for road segments with AADT of 0 | |
defaultAADT: | |
primary: 1000 | |
secondary: 500 | |
tertiary: 100 | |
vicinal: 0 | |
# Condition rate of the bridge or culvert. To be applied to the damage to | |
# account for the fact that the condition of the structure will influence how | |
# much damage it takes. | |
bridgeConditionRates: | |
poor: 0.3 | |
fair: 0.5 | |
good: 0.7 | |
# Road User Cost (RUC) in dollar/km per type of road | |
roadUserCost: | |
asphalt: 0.23 | |
gravel: 0.27 | |
earth: 0.3 | |
# Cost of each of the interventions. Units are: | |
# - usd/meters for bridges | |
# - usd/km for general interventions | |
# - usd/unit for culverts | |
interventionCost: | |
# In the case of general interventions it is the cost of applying the | |
# intervention on a given road type. | |
general: | |
upgrade-gravel: | |
primary: 60000 | |
secondary: 60000 | |
tertiary: 60000 | |
vicinal: 60000 | |
upgrade-asphalt: | |
primary: 1000000 | |
secondary: 1000000 | |
tertiary: 550000 | |
vicinal: 550000 | |
rehab-earth: | |
primary: 5000 | |
secondary: 5000 | |
tertiary: 5000 | |
vicinal: 5000 | |
rehab-gravel: | |
primary: 28000 | |
secondary: 28000 | |
tertiary: 28000 | |
vicinal: 28000 | |
rehab-asphalt: | |
primary: 320000 | |
secondary: 215000 | |
tertiary: 215000 | |
vicinal: 215000 | |
# In the case of interventions on culverts it is the cost of applying | |
# an intervention on a type of road with a given surface | |
culverts: | |
culverts-replace: | |
paved: | |
primary: 11000 | |
secondary: 11000 | |
tertiary: 11000 | |
vicinal: 11000 | |
unpaved: | |
primary: 11000 | |
secondary: 11000 | |
tertiary: 11000 | |
vicinal: 11000 | |
culverts-repair: | |
paved: | |
primary: 10000 | |
secondary: 10000 | |
tertiary: 10000 | |
vicinal: 10000 | |
unpaved: | |
primary: 11000 | |
secondary: 11000 | |
tertiary: 11000 | |
vicinal: 11000 | |
# Bridges improvements are applied the same way as culverts. | |
bridges: | |
bridges-repair: | |
paved: | |
primary: 44000 | |
secondary: 44000 | |
tertiary: 44000 | |
vicinal: 44000 | |
unpaved: | |
primary: 44000 | |
secondary: 44000 | |
tertiary: 44000 | |
vicinal: 44000 | |
# Maintenance values for the road agency: | |
# - recurrent are annual costs per kilometer | |
# - periodic are costs per kilometer which occur at the interval | |
# - interval in years | |
# | |
# Costs are calculated taking into account the surface type and road condition. | |
maintenanceCost: | |
asphalt: | |
good: | |
recurrent: 1250 | |
periodic: 8571 | |
interval: 9 | |
fair: | |
recurrent: 1500 | |
periodic: 8751 | |
interval: 9 | |
poor: | |
recurrent: 750 | |
periodic: 19286 | |
interval: 9 | |
gravel: | |
good: | |
recurrent: 626 | |
periodic: 2143 | |
interval: 1 | |
fair: | |
recurrent: 750 | |
periodic: 2143 | |
interval: 1 | |
poor: | |
recurrent: 375 | |
periodic: 12143 | |
interval: 1 | |
earth: | |
good: | |
recurrent: 225 | |
periodic: 571 | |
interval: 4 | |
fair: | |
recurrent: 300 | |
periodic: 571 | |
interval: 4 | |
poor: | |
recurrent: 150 | |
periodic: 5714 | |
interval: 4 | |
baseline: | |
good: | |
recurrent: 113 | |
periodic: 286 | |
interval: 8 | |
fair: | |
recurrent: 150 | |
periodic: 286 | |
interval: 8 | |
poor: | |
recurrent: 75 | |
periodic: 2857 | |
interval: 8 | |
# Repair cost of a road per kilometer after a flood | |
# low, medium, high refers to severity of flood | |
# Cost is per severity - road surface - road type | |
repairCostRoad: | |
low: | |
paved: | |
primary: 2000 | |
secondary: 2000 | |
tertiary: 2000 | |
vicinal: 2000 | |
unpaved: | |
primary: 15000 | |
secondary: 15000 | |
tertiary: 15000 | |
vicinal: 15000 | |
medium: | |
paved: | |
primary: 4000 | |
secondary: 4000 | |
tertiary: 4000 | |
vicinal: 4000 | |
unpaved: | |
primary: 27000 | |
secondary: 27000 | |
tertiary: 27000 | |
vicinal: 27000 | |
high: | |
paved: | |
primary: 20000 | |
secondary: 20000 | |
tertiary: 20000 | |
vicinal: 20000 | |
unpaved: | |
primary: 55000 | |
secondary: 55000 | |
tertiary: 55000 | |
vicinal: 55000 | |
# Flood repair time in hours / km. Depends on three factors: | |
# - type of road (primary, secondary, tertiary, vicinal) | |
# - surface type (paved, unpaved) | |
# - severity of the flood (low, medium, high) | |
floodRepairTime: | |
low: | |
paved: | |
primary: 168 | |
secondary: 168 | |
tertiary: 168 | |
vicinal: 168 | |
unpaved: | |
primary: 1440 | |
secondary: 1440 | |
tertiary: 1440 | |
vicinal: 1440 | |
medium: | |
paved: | |
primary: 336 | |
secondary: 336 | |
tertiary: 336 | |
vicinal: 336 | |
unpaved: | |
primary: 2160 | |
secondary: 2160 | |
tertiary: 2160 | |
vicinal: 2160 | |
high: | |
paved: | |
primary: 1056 | |
secondary: 1056 | |
tertiary: 1056 | |
vicinal: 1056 | |
unpaved: | |
primary: 4320 | |
secondary: 4320 | |
tertiary: 4320 | |
vicinal: 4320 | |
# For which return period were the bridges and culverts designed for. | |
designStandard: | |
bridge: 100 | |
culvert: 20 |