Skip to content

Instantly share code, notes, and snippets.

@bossjones
Created May 23, 2025 14:27
Show Gist options
  • Save bossjones/647ce26fe2152ec34f11ffa8be3bd34f to your computer and use it in GitHub Desktop.
Save bossjones/647ce26fe2152ec34f11ffa8be3bd34f to your computer and use it in GitHub Desktop.
migration.txt
Key Achievements
- ✅ New modular structure with dedicated AI, CLI, monitoring, and storage modules
- ✅ Backward compatibility preserved - existing code continues to work with deprecation warnings
- ✅ All tests passing - no functionality broken during migration
- ✅ Deprecation system working - clear migration path for future phases
- ✅ Health check system - automated validation script for future phases
Next Steps
The foundation is now set for Phase 2 (CLI expansion) and Phase 3 (AI integration). The new structure provides:
- Clear separation of concerns
- Dedicated AI module ready for LangChain/LangGraph
- Modular CLI structure ready for subcommands
- Enhanced monitoring and storage organization
- Safe migration path with backward compatibility
Phase 1 migration is complete and ready for production deployment with feature flags!
> question. I just created a PR Enumerating objects: 66, done.
Counting objects: 100% (65/65), done.
Delta compression using up to 10 threads
Compressing objects: 100% (36/36), done.
Writing objects: 100% (38/38), 5.76 KiB | 5.76 MiB/s, done.
Total 38 (delta 16), reused 0 (delta 0), pack-reused 0 (from 0)
remote: Resolving deltas: 100% (16/16), completed with 7 local objects.
remote:
remote: Create a pull request for 'feature-migration-2' on GitHub by visiting:
remote: https://github.com/bossjones/boss-bot/pull/new/feature-migration-2
remote:
To github.com:bossjones/boss-bot.git
* [new branch] feature-migration-2 -> feature-migration-2
After I get that PR merged am I suppose to cut a release before we continue on to phase 2 ? what is the right order of operations here.
⏺ Excellent question! According to the migration plan in MIGRATION.md, you should cut a release after each phase to ensure proper version tracking and deployment. Here's the correct order of operations:
Order of Operations for Phase 1 → Phase 2
1. Complete Phase 1 PR Review & Merge ✅ (You're here)
- Review and merge your feature-migration-2 PR
- This closes Phase 1
2. Create Phase 1 Release
After the PR is merged, you should create a release using the existing Commitizen workflow:
# Use the existing release preparation script
./scripts/ci/cz-prepare-release.sh
# This will:
# - Determine version bump (likely minor: 0.1.0 → 0.2.0)
# - Create release branch and PR
# - Generate changelog from conventional commits
# After the release PR is merged:
./scripts/ci/cz-release.sh
# This creates the GitHub release
3. Enhance Release with Migration Details
# Add migration-specific details to the release
./scripts/enhance-migration-release.sh phase-1-foundation
4. Deploy Phase 1 (Optional)
Since this includes backward compatibility, it can be safely deployed to production with feature flags.
5. Begin Phase 2
Only after Phase 1 is released and stable should you start Phase 2.
Why Release Between Phases?
1. Isolated Changes - Each phase can be reviewed/tested independently
2. Rollback Safety - Can rollback to previous stable version if needed
3. Feature Flag Control - Can enable/disable features gradually
4. Clear Documentation - Each release documents specific migration changes
5. CI/CD Integration - Automated deployment and monitoring per phase
Recommended Timeline
# Today: Complete Phase 1
1. Merge feature-migration-2 PR
2. Run: ./scripts/ci/cz-prepare-release.sh
3. Merge release PR
4. Run: ./scripts/ci/cz-release.sh
5. Monitor deployment
# Next: Phase 2 (CLI Expansion)
# Start only after Phase 1 is confirmed stable
This follows the migration plan's Pull Request Strategy where each phase creates a dedicated release for isolated review, testing, and deployment.
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment